Dynamo Users Scotland
  • Home
  • Resources
  • Why We Are Here
  • News
  • BIM-Blog
  • Home
  • Resources
  • Why We Are Here
  • News
  • BIM-Blog
Search by typing & pressing enter

YOUR CART

All sorts of BIM Blogging

1/7/2026 0 Comments

Understanding BIM Requirements: Uniclass

Uniclass 2015 is a classification system used to organise elements of the built environment.

It sits alongside other systems such as SFG20, CAWS, Omniclass, and CISfb, each with strengths depending on the use case and region. From a UK BIM perspective, Uniclass is significant because it is specified in the UK Annex of BS EN ISO 19650‑2, which most BIM projects follow.


A key advantage is that Uniclass is object‑based, aligning naturally with BIM’s object‑oriented structure. When interrogating a wall, for example, all aspects of its specification can be grouped together. In contrast, CAWS separates construction and finishing information across different sections, which made sense for traditional specification workflows but is less suited to digital object‑based processes.

Because BIM workflows often involve passing objects between platforms (e.g., Revit → IFC → FM systems), having a consistent object classification helps maintain clarity and completeness across exchanges.

How Uniclass Classifies a Project

Uniclass allows classification at multiple levels:
  • Entities such as buildings or ancillary structures
  • Spaces and locations like kitchens, bathrooms, meeting rooms
  • Elements and functions including walls, floors, roofs, pipework, lighting, and energy systems
  • Systems such as security, drainage, fire suppression
  • Products including furniture, fittings, equipment, and components

These layers support both design‑stage definition and asset‑management recording.

Uniclass Tables

Uniclass 2015 is maintained by NBS and updated quarterly. The system is hierarchical, machine‑readable, and expandable, with tables covering:
  • Activities (Ac)
  • Complexes (Co)
  • Entities (En)
  • Spaces/Locations (SL)
  • Elements/Functions (EF)
  • Systems (Ss)
  • Products (Pr)
  • Tools and Equipment (TE)
  • Project Management (PM)
  • Form of Information (FI)
  • Roles (Ro)
  • Materials (Ma)
  • Properties & Characteristics (PC)
  • CAD/Modelling Content (Zz)

Example: Ac_32_50 – Marine and water activities
Because the tables evolve, gaps can be filled and reorganised over time. This flexibility is useful for digital workflows but can create challenges for human readability and long‑term consistency.


Updates and Versioning Challenges

Quarterly updates mean codes can change mid‑project. If a team specifies a product early on and the code is later revised, the project must decide whether to freeze a version or update throughout. NBS provides change notes, but in practice many clients are not deeply concerned with versioning.

This is partly due to how BIM adoption developed in the UK: driven top‑down by government rather than client demand. Historically, building management systems used SFG20 rather than Uniclass, and quantity surveyors used NRM, so Uniclass versioning had limited operational impact.

Mapping and Conflicts

Mapping between classification systems is rarely straightforward. Different systems were built on different logic, so they do not align 1:1. Even within Uniclass, overlaps occur:

  • A curtain wall can be a system, a product, or composed of multiple products.
  • A door can be treated as an element, a product, or a system (leaf, frame, ironmongery, closers).

This complexity means employers must be precise when writing Exchange Information Requirements (EIRs). If asset requirements are vague, classification becomes time‑consuming and costly later.

Examples of clearer employer direction:

  • “Pricing must use NRM codes.”
  • “Handover information must use SFG20 codes for BMS integration.”

Uniclass is a sensible default for BIM, but operational needs should ultimately drive the chosen coding system.

Using the Tables

Uniclass supports classification across the entire lifecycle: concept, design, construction, asset management, reuse, and demolition. It complies with ISO 12006‑2, making it suitable for ISO 19650 information management.
Codes follow a structured pattern:
  • Table prefix (e.g., Ss_, Pr_, FI_)
  • Up to four pairs of digits, each adding detail

Example:
Ss_30_10_30_25 – Heavy steel roof framing systems
Ss_50_70_85_70 – Rainwater harvesting systems


This hierarchical structure allows classification from broad concepts down to specific objects.


Licensing and Expansion

Uniclass is licensed under CC BY‑ND 4.0, meaning it can be used freely but not altered.

​Additions must be proposed to NBS to maintain consistency.

The tables are continually refined based on industry feedback.
0 Comments



Leave a Reply.

    Author

    Mark is a BIM Expert and qualified UK Architect.  He currently works with Reope building digital solutions for built environment.

    Archives

    July 2026
    January 2026
    October 2025
    September 2025
    March 2025
    December 2024
    February 2023
    May 2022
    September 2021

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.