https://app.notion.com/native/p/reope/Groups-or-Links-After-26-Years-of-Revit-Here-s-the-Honest-Answer-35e39bda3b93813d92aec4912ecfca1a?assetsVersion=23.13.20260531.2144&deepLinkOpenNewTab=true This is a discussion which, like everything in Revit, is project, office and user dependant. The goal for every project is to be optimal. Taking on sub-optimal workflows is going to cost money and time. Usually there is a judgement call to be made, it is likely that there is a grey zone where 'we usually do it like this' has to be balanced with 'it really doesn't suit this project'. The judgement call of 'optimal' needs to be made by the person in the company with the most experience, likely a BIM expert who has seen multiple projects structured in a variety of ways. Key Differentiators: Groups Stability
different core thickness to some other non-group wall which another instance is joined to, the group is now different, the wall is longer and Revit will get sad about that.
Flexibility
Usability
Links Stability
many drawings as possible from the actual link file, to avoid the possibility of tags and dimensions dropping. Flexibility
Usability
Between all these factors, a holistic decision must be made, taking into account the client, design team, specifics regarding project size, complexity and repetition. If a client requires individual apartment numbers, then however much you might want to use links, you are going to struggle to work around this. Of course there are work arounds, but is this optimal? That's where the expert takes their call. Perhaps a persuasive senior team member can work their magic and help the client see the light, but we need to know now. An honest assessment has to be made.... The classic example here is repetition. 'We have 6 unit types' .... ... Do you really? ... Yes, they are mirrored of course, and the ceiling height is different on the top floor and bottom floor and on Block A we have a different drainage strategy, so the pipes are different sizes.... ... Oh Ok, so actually you have 50 unit types, well, that affects our assessment. ... Do you really? ... Yes, we are desigining a point tower, everything stacks. ... Ok, let's do it then. Other honesty is around the reality of the design process, once you're locked into links, if the structural engineer wants that different structural solution on another block, have your links just doubled in number? The judgement has to take into account a deep understanding of what a link and group is, how its outputs are affected. For both options, having solid office workflows, with strong libraries of families and types, with graphic standards, is going to make all of this run smoothly whichever choice. There is always going to be a downside, no option is perfect, so good communication, planning and strategy is always the highest priority.
0 Comments
Leave a Reply. |
AuthorMark is a BIM Expert and qualified UK Architect. He currently works with Reope building digital solutions for built environment. Archives
July 2026
Categories |
RSS Feed