Dynamo Users Scotland
  • Home
  • Resources
  • Why We Are Here
  • News
  • BIM-Blog
  • Home
  • Resources
  • Why We Are Here
  • News
  • BIM-Blog
Search by typing & pressing enter

YOUR CART

All sorts of BIM Blogging

7/24/2026 0 Comments

Using Dynamo to Drive Revit Families from a Linked DWG

A linked DWG is usually treated as a fixed reference, but Dynamo can read it as a live input instead, and use it to drive Revit family placement directly.

You may know that you can use a DWG to build a native Revit TopoSolid.  'Create from Import' is in the TopoSolid panel in Massing & Site, just select the DWG and choose which layers have the levels. 

This is nice, but what if you want more? Dynamo can help supercharge your DWG usage.

Even a simple graphs like 'select model element' and 'get element geometry' can be a life saver, but usually you'd like a bit more control.

Say the DWG is a survey, perhaps you want to make some pipes, you can read the geometry and its layers to isolate what you need...  Reading the text from the geometry needs a package (BiMorph has many useful nodes for these tasks)  or custom code such as:

        layer_name = doc.GetElement(geom_obj.GraphicsStyleId).GraphicsStyleCategory.Name

Where geom_obj is an item from iterating the ImportInstance's geometry, and doc is the current document.

You'll then pass this information through the graph until you make a pipe...

        pipe = Pipe.Create(doc, system_type_id, pipe_type_id, level_id, start_pt, end_pt)

Taking an Object Oriented approach is going to help with all these different pieces of data, so a dictionary or sub-list per pipe is going to keep everything consistent.

Pipes are a whole interesting topic for future blogs! Just one thing to note... If you move the start point you also move the end point!  So if you need to change the angle of a pipe, you want to set a new location curve, that will update the whole pipe position. 

        pipe.Location.Curve = updatedLine

A great aspect of these flows is the ability to re-run the graph to update the families as you need.  No more manual drawing.  You can also have a follow on comparison graph to show changes and compare before and after.

0 Comments

7/20/2026 0 Comments

Spring Nodes Updated for Revit 2027 and Dynamo 4.0

Reope has released a full refresh of Spring Nodes, one of Dynamo’s most‑installed packages, bringing hundreds of nodes back into working order for Revit 2027 and Dynamo 4.0.

Full post here... www.reope.com/case-studies/spring-nodes


Spring Nodes is one of Dynamo’s most‑installed and most‑relied‑upon packages.

Originally developed by Dimitar Venkov, it provides hundreds of MIT‑licensed nodes that extend Dynamo’s access to the Revit API and offer readable DesignScript examples. Over several major changes to Dynamo, Python, DesignScript, and the Revit API, a substantial portion of the package became non‑functional.


The transition from IronPython 2.7 to CPython3 removed capabilities used by Spring Nodes’ UI layer. Dialogues, drag‑select, list‑selection, and reorder operations no longer executed.

Several geometry and family‑creation nodes also failed due to API changes. Although the package appeared healthy in the manager, reliability in production graphs had degraded.


Process

Each node was reviewed individually. A dedicated test graph and screenshot were created for reference. The work focused on:
  1. Functional audit on Revit 2027 and Dynamo 4.
  2. Updating nodes against the current Revit API and CPython3, retaining DesignScript where appropriate.
  3. Restoring UI‑dependent nodes that had been non‑operational for multiple Dynamo releases.​

The release pipeline required no changes; all engineering effort was concentrated in the nodes.

Results
  • UI nodes now execute correctly under CPython3: dialogues, drag‑select, list pickers, and reorder tools.
  • Geometry and family workflows restored: in‑place family creation, quad‑to‑tri mesh conversion, and related geometry utilities.
  • Report‑parsing nodes validated: clash‑report HTML and warning‑report parsing remain functional.
  • Full compatibility with Revit 2027 and Dynamo 4.

Graphs using Spring Nodes now run predictably on current installations.

Additions

New nodes introduced during the update include:
  • Excel Write
  • Regular Expression Checker
  • DWG Geometry Extraction

A Notion‑based reference library documents the entire package with screenshots and concise descriptions.
​reope.notion.site/dynamo-spring-nodes-package-catalogue?v=d5b6a94228594a5e8e193150d2e9f8f9&source=copy_link
​

Context

AI‑generated Dynamo code remains inconsistent.

Stable, readable, well‑tested node libraries continue to be essential for dependable automation.

Spring Nodes provides this stability and retains functionality not covered by built‑in nodes.


Users should update via the package manager.
0 Comments

1/7/2026 0 Comments

Understanding BIM Requirements: Uniclass

Uniclass 2015 is a classification system used to organise elements of the built environment.

It sits alongside other systems such as SFG20, CAWS, Omniclass, and CISfb, each with strengths depending on the use case and region. From a UK BIM perspective, Uniclass is significant because it is specified in the UK Annex of BS EN ISO 19650‑2, which most BIM projects follow.


A key advantage is that Uniclass is object‑based, aligning naturally with BIM’s object‑oriented structure. When interrogating a wall, for example, all aspects of its specification can be grouped together. In contrast, CAWS separates construction and finishing information across different sections, which made sense for traditional specification workflows but is less suited to digital object‑based processes.

Because BIM workflows often involve passing objects between platforms (e.g., Revit → IFC → FM systems), having a consistent object classification helps maintain clarity and completeness across exchanges.

How Uniclass Classifies a Project

Uniclass allows classification at multiple levels:
  • Entities such as buildings or ancillary structures
  • Spaces and locations like kitchens, bathrooms, meeting rooms
  • Elements and functions including walls, floors, roofs, pipework, lighting, and energy systems
  • Systems such as security, drainage, fire suppression
  • Products including furniture, fittings, equipment, and components

These layers support both design‑stage definition and asset‑management recording.

Uniclass Tables

Uniclass 2015 is maintained by NBS and updated quarterly. The system is hierarchical, machine‑readable, and expandable, with tables covering:
  • Activities (Ac)
  • Complexes (Co)
  • Entities (En)
  • Spaces/Locations (SL)
  • Elements/Functions (EF)
  • Systems (Ss)
  • Products (Pr)
  • Tools and Equipment (TE)
  • Project Management (PM)
  • Form of Information (FI)
  • Roles (Ro)
  • Materials (Ma)
  • Properties & Characteristics (PC)
  • CAD/Modelling Content (Zz)

Example: Ac_32_50 – Marine and water activities
Because the tables evolve, gaps can be filled and reorganised over time. This flexibility is useful for digital workflows but can create challenges for human readability and long‑term consistency.


Updates and Versioning Challenges

Quarterly updates mean codes can change mid‑project. If a team specifies a product early on and the code is later revised, the project must decide whether to freeze a version or update throughout. NBS provides change notes, but in practice many clients are not deeply concerned with versioning.

This is partly due to how BIM adoption developed in the UK: driven top‑down by government rather than client demand. Historically, building management systems used SFG20 rather than Uniclass, and quantity surveyors used NRM, so Uniclass versioning had limited operational impact.

Mapping and Conflicts

Mapping between classification systems is rarely straightforward. Different systems were built on different logic, so they do not align 1:1. Even within Uniclass, overlaps occur:

  • A curtain wall can be a system, a product, or composed of multiple products.
  • A door can be treated as an element, a product, or a system (leaf, frame, ironmongery, closers).

This complexity means employers must be precise when writing Exchange Information Requirements (EIRs). If asset requirements are vague, classification becomes time‑consuming and costly later.

Examples of clearer employer direction:

  • “Pricing must use NRM codes.”
  • “Handover information must use SFG20 codes for BMS integration.”

Uniclass is a sensible default for BIM, but operational needs should ultimately drive the chosen coding system.

Using the Tables

Uniclass supports classification across the entire lifecycle: concept, design, construction, asset management, reuse, and demolition. It complies with ISO 12006‑2, making it suitable for ISO 19650 information management.
Codes follow a structured pattern:
  • Table prefix (e.g., Ss_, Pr_, FI_)
  • Up to four pairs of digits, each adding detail

Example:
Ss_30_10_30_25 – Heavy steel roof framing systems
Ss_50_70_85_70 – Rainwater harvesting systems


This hierarchical structure allows classification from broad concepts down to specific objects.


Licensing and Expansion

Uniclass is licensed under CC BY‑ND 4.0, meaning it can be used freely but not altered.

​Additions must be proposed to NBS to maintain consistency.

The tables are continually refined based on industry feedback.
0 Comments

10/28/2025 0 Comments

A Lightweight Way to Log Revit Add‑In Usage with PyRevit Hooks

Full Tutorial

The full step‑by‑step guide — including folder setup, deployment, and Power BI visuals:

https://www.reope.com/bimagination/a-very-simple-data-logging-setup-for-revit-with-pyrevit

Why? 

Understanding how teams actually use Revit tools is one of the most valuable — and most overlooked — parts of BIM management.

Whether you’re tracking adoption, identifying training needs, or justifying investment in add‑ins, usage data builds a narrative  that model audits alone can’t.


Revit doesn’t expose this information directly, but PyRevit does. Specifically: the journal-command-exec.py hook, which fires every time a Revit command is executed.

With a tiny amount of Python, you can capture:
  • Who ran a command
  • Which Revit file they were in
  • Which add‑in or tool they used
  • When they used it

This creates a simple, reliable telemetry stream — no licensing cost, no complex deployment, and no performance impact.

Why BIM Managers Should Care

This kind of logging helps you answer questions that normally require guesswork:
  • Which tools are actually being used?
  • Which users rely on which add‑ins?
  • Where should training be focused?
  • Which tools justify renewal or expansion?
  • Are ISO 19650 workflows being followed?
  • Are naming tools, sheet generators, or parameter scripts being used consistently?

It’s a small automation with big organisational impact.

The Core PyRevit Hook

PyRevit exposes a special script location:

pyrevit_hooks/journal-command-exec.py

Any code placed here runs every time a Revit command executes.

Here’s the minimal version of the logging logic:

from pyrevit import EXEC_PARAMS
from datetime import datetime
import os

user = os.environ.get("USERNAME")
doc = __revit__.ActiveUIDocument.Document
cmd = EXEC_PARAMS.event_args.CommandId logline = f"{user} | {doc.Title} | {cmd} | {datetime.now()}"


From here, you can append logline to a text file, CSV, or network location.

That’s it — you now have Revit telemetry.

Where This Helps Most

1. Add‑in ROI Tracking

If you’re deploying tools across multiple teams, usage data helps justify renewals and identify which tools deliver value.

2. Training & Support

Usage patterns reveal:
  • who needs training
  • who is your “power user”
  • which tools are misunderstood or ignored

3. Workflow Compliance

If your organisation relies on:
  • naming tools
  • parameter scripts
  • sheet generators
  • model‑audit tools

…you can verify whether they’re actually being used.

4. Model Health Dashboards

Combine this with:
  • Revit journals
  • ACC issue data
  • Power BI
…and you get a complete picture of project behaviour.

A Simple Output Pipeline

Most teams do this:
  1. Log to a shared folder
  2. Pull the logs into Power BI
  3. Build dashboards showing usage by:
    • user
    • project
    • tool
    • time
It’s simple, fast, and effective.

0 Comments

9/28/2025 0 Comments

How to Build a BIM Execution Plan That Works for Everyone

What is a BIM Execution Plan?

A BIM Execution Plan (BEP) is a strategic document that outlines how BIM processes will be implemented on a project. Within the ISO 19650 framework, the BEP is created as a response to the Exchange Information Requirements (EIR) — the client’s detailed statement of what information must be delivered, when, and in what form.

In principle, the BEP should address each requirement directly, explaining how the delivery team will meet it. This gives the client confidence that the project will follow a consistent, compliant information‑management approach.

In practice, many clients do not have fully developed information requirements at project start. They may not yet know what they will need at handover, and often rely on expert guidance to shape these documents over time. A well‑structured BEP supports this by aligning stakeholders, defining workflows, and ensuring BIM is used effectively throughout the project lifecycle.

What Should a BEP Include?

​
A robust BEP typically covers:
  • Project Information — scope, objectives, timelines, stakeholders
  • BIM Objectives — asset requirements, quality targets, cost efficiency
  • Standards and Protocols — modelling rules, file formats, naming conventions, data‑exchange procedures
  • Roles and Responsibilities — clear accountability for information production and review
  • Modelling Requirements — level of information need, accuracy expectations, phase‑specific detail
  • Technology and Tools — authoring platforms, collaboration environments, CDE requirements
  • Collaboration and Communication — meeting structures, review processes, issue management
  • Quality Assurance — geometry checks, data validation, compliance reviews
  • Data Management and Security — storage, access control, audit trails
  • Deliverables — formats, timelines, approval processes, submission workflows

These components ensure that information is produced consistently and that all parties understand how BIM will function across the project.

How to Ensure the BEP Works for Everyone

A BEP is most effective when developed collaboratively and treated as a living document.

Early Engagement

Start by establishing a clear understanding of project scope, objectives, and stakeholders. As consultants, designers, and contractors join the project, they should be onboarded into the information‑management process so nothing is overlooked. This helps ensure that handover data is delivered smoothly and in a form that operational teams can use immediately.

Collaboration and Communication

Regular meetings, workshops, and coordinated data exchanges keep teams aligned. Digital collaboration platforms (e.g., cloud‑based CDEs, model‑review tools) help maintain visibility and reduce misunderstandings. Direct communication — quick calls or messages — often resolves issues faster than lengthy email chains.

Choosing the Right Tools and Standards

Selecting compatible BIM tools and technologies is essential for efficient workflows. ISO 19650, the UK BIM Framework, and legacy standards such as PAS 1192 provide structure for defining roles, responsibilities, and information‑management procedures. Aligning these with project goals ensures consistent delivery and avoids fragmentation.

Clear Roles and Robust Procedures

Defining responsibilities early prevents gaps in information production. Training and guidance help teams understand expectations, while structured procedures for sharing, reviewing, and approving information create a stable foundation for the BEP.

Main Takeaways
​
  • A BEP is essential for successful BIM implementation, providing a roadmap for collaboration and consistent standards.
  • Collaboration drives success — early involvement, clear roles, and continuous communication keep teams aligned.
  • Treat the BEP as a living document — review and update it regularly to ensure it remains relevant throughout the project lifecycle.
0 Comments

3/11/2025 0 Comments

Top Tips for BIM Success

BIM works best when the underlying processes, documentation, and collaboration structures are clearly defined.

The following principles help ensure that BIM delivers reliable, repeatable value across a project’s lifecycle.

1. BIM is a Process, Not a Piece of Software

Buying a software licence does not deliver BIM. The core of BIM lies in how information is created, shared, reviewed, validated, and delivered. These workflows must be robust, consistent, and agreed upon early.

Effective BIM requires:

  • A clear strategy
  • Defined processes
  • A roadmap for how information will be managed
  • Commitment from all parties

Without these, even the best tools will fail to produce reliable outcomes.

2. Build a Strong Foundation

Misalignment at the start of a BIM project causes friction later. The solution is simple: document everything early, including uncertainties.

Key standards provide structure:
​
  • BS EN ISO 19650‑1 — Defines Information Requirements:
    • Organisational (OIR)
    • Project (PIR)
    • Exchange (EIR)
    • Asset (AIR)
  • BS EN ISO 19650‑2 — Defines the BIM Execution Plan (BEP), explaining how information management will be carried out to meet those requirements.

Capturing these requirements upfront ensures that teams work from the same baseline and understand what information must be produced, when, and by whom.


3. Collaboration Is Essential

BIM is a team sport. Strong communication prevents misunderstandings, reduces rework, and keeps information aligned.

Digital tools help:
  • Cloud‑based workflows (e.g., Autodesk Construction Cloud) make issues visible to the entire team instantly.
  • Design review platforms (ACC Design Collaboration, Dalux, etc.) support shared model reviews and coordinated decision‑making.
  • Regular meetings, even virtual ones, maintain alignment and accountability.
  • Direct communication (Teams calls, quick chats) often resolves issues faster than long email chains.

The combination of structured digital collaboration and human communication ensures clarity and reduces friction across disciplines.
0 Comments

12/3/2024 0 Comments

Understanding BIM Strategy: A Key to Smarter Project Delivery

In today’s construction environment, BIM is no longer optional. Effective implementation requires more than software licences or isolated standards; it depends on a clear, well‑structured strategy that guides how BIM is adopted, managed, and scaled across a project or organisation.

What Is a BIM Strategy?

A BIM strategy is a structured plan that defines how BIM processes will be applied. It covers compliance with standards such as ISO 19650 and BIM Level 2 (as defined by the UK BIM Framework), and sets out consistent workflows, data‑management protocols, and collaborative practices.

A strong BIM strategy typically focuses on:
  • Compliance — meeting industry standards and client requirements
  • Implementation — ensuring teams have the skills, tools, and resources to deliver
  • Growth — using BIM to unlock efficiencies, improve quality, and support organisational development

Why Having a Strategy Matters

Without a defined strategy, BIM adoption can become fragmented, inefficient, and costly. A clear plan ensures that stakeholders are aligned, equipped, and working toward consistent information‑management outcomes.
Key components often include:
  • Organisation‑level BIM strategy development — defining goals and creating a roadmap for delivery
  • Documentation creation — establishing a coherent suite of standards, templates, and procedures
  • BIM coordination and management — supporting collaboration across disciplines
  • Project setup and support — establishing workflows, environments, and requirements from the outset
  • Point cloud modelling and bespoke solutions — converting complex datasets into usable models

These elements help ensure that BIM is implemented consistently and that information flows smoothly across the project lifecycle.

Main Takeaways
​
  • A BIM strategy is essential for successful BIM implementation, providing structure, clarity, and alignment across teams.
  • Collaboration drives success — early involvement, defined roles, and continuous communication keep BIM processes efficient.
  • Treat the strategy as a living framework — review and refine it regularly to ensure it remains effective as the project evolves.
0 Comments

2/23/2023 0 Comments

COBie and BIM: What You Really Need to Know

What is COBie?

COBie is most commonly encountered as a spreadsheet. Developed by Bill East, it was created to bridge the gap between construction and building management by providing structured, machine‑readable asset information. Although the multi‑tab format can look overwhelming, its purpose is straightforward: to deliver the information needed to operate and maintain a building.

COBie typically captures:
  • Maintainable assets (e.g., fire‑rated doors)
  • Location and identification information
  • Maintenance schedules and product data

When imported into a building management system, this data allows teams to access asset information instantly — whether on a desktop or a tablet.


Why Are You Being Asked for COBie?

If a project requires COBie, it’s because the client needs structured, consistent asset information at handover. COBie (Construction‑Operations Building information exchange) provides a standardised format for delivering this data, particularly for operations and maintenance.

What Does COBie Have to Do With BIM?

In the UK, COBie forms part of BIM “Level 2” under the UK BIM Framework. As a result, most public sector projects — and an increasing number of private ones — require COBie deliverables.

Being unable to produce COBie can limit eligibility for certain contracts. But beyond compliance, COBie ensures clients receive usable, structured data that can integrate with a wide range of building management systems.

How Should You Approach COBie?

A practical way to begin is to work backwards from operational needs.
  1. Identify maintainable assets Fire doors, pumps, filters, and any component with a maintenance regime.
  2. Define the data actually required What does the chosen system need to track and maintain those assets?
  3. Communicate early Inform the design team as soon as possible. Early clarity prevents wasted effort and ensures the COBie output is genuinely valuable.

Is COBie the Panacea of Asset Data?

Not necessarily. COBie is a strong general‑purpose format and a reasonable baseline for asset information. However, if the building management system is known in advance — and its data structure differs — those requirements should be defined explicitly in the Asset Information Requirements (AIR).


The key principles are:
  • Know what you want
  • Communicate it clearly
  • Only ask for what will actually be used

Want to Learn More?

This guide is a plain‑language introduction to COBie. The wider BIM ecosystem contains many standards, acronyms, and frameworks, and not all of them are essential for every project.

For those who want to explore deeper topics — such as COBie’s relationship to IFC, NBIMS‑US, or ISO 19650 requirements — the following resources are useful:
​
  • https://prairieskyconsulting.com/
  • https://imiframework.org/
  • https://nibs.org/nbims/v4/introduction/
  • https://www.buildingsmart.org/


Make COBie Work for You

COBie is more than a spreadsheet — it’s a tool for improving building operation. By understanding its purpose and tailoring it to actual asset needs, it becomes a meaningful part of digital handover rather than a compliance burden.
0 Comments

5/2/2022 0 Comments

Groups vs Links for Apartment Projects

Further discussion here:

​https://app.notion.com/native/p/reope/Groups-or-Links-After-26-Years-of-Revit-Here-s-the-Honest-Answer-35e39bda3b93813d92aec4912ecfca1a?assetsVersion=23.13.20260531.2144&deepLinkOpenNewTab=true

This is a discussion which, like everything in Revit, is project, office and user dependant.  The goal for every project is to be optimal.  Taking on sub-optimal workflows is going to cost money and time.

Usually there is a judgement call to be made, it is likely that there is a grey zone where 'we usually do it like this' has to be balanced with 'it really doesn't suit this project'. 

The judgement call of 'optimal' needs to be made by the person in the company with the most experience, likely a BIM expert who has seen multiple projects structured in a variety of ways.  

Key Differentiators:

Groups 

       Stability
  • A group is prone to become incompatible with its fellow groups without reason.   You will copy and paste a group onto a new level, all fine.  Then you'll do it again, and Revit will refuse.  Then  you make a new group type and place it and swap it back to the original, delete the variant and have the same thing happen again and again.
            This can be mitigated, but fundamentally groups are flaky. Say a group wall joins into a non-group wall, which has a
           different core thickness to some other non-group wall which another instance is joined to, the group is now   
           different, the wall is longer and Revit will get sad about that. 

  • Nesting groups becomes unstable.  If you are following a pure group strategy you will probably start nesting the Kitchen Type group inside the Unit Type group.  And at some point  you will find that kitchen ungrouped itself without telling you.


      Flexibility
  • A group lets you have Apartment specific values, often the design and construction team like to know that'this is the door numbered 2001-A' etc. 
  • A group in one file can become different to that of another file, this can be good or bad! Let's say that in this Block a pipe must be 10mm moved to the other Block, we have 2 different builders... 
    • Good - The builder wants just a few Types to keep things simple,  to know that this is a Type 6, they don't want 50 types, they can just cut a different hole from the timber.
    • Bad - The builder is a volumetric modular, the 10mm means the pipe does not fit through a concrete opening. 
            Maintaining consistency across Revit files can be challenging!

        Usability
  • Most users get the concept of groups, you click into it, its in your file, you can edit it, it doesn't require complex workflows or explanations.


Links
     Stability
  • A link is very reliable, you can trust that all links are identical.  The only caveat to that is if it loses its path and becomes unlinked.  
           Again, this can be mitigated, and the new cloud links are more stable than server paths.  It is advised to produce as 
           many drawings as possible from the actual link file, to avoid the possibility of tags and dimensions dropping.

     Flexibility
  • Links can be flexible, to a degree, but mostly the point of the link is to be unflexible.  So, if your floor height varies, you will need different links.  Of course you could 'make a view showing a design option which has different wall heights', but then someone could accidently use the 'wrong view' and you've undone all your trust.

    Usability
  • Linking workflows are likely a bit less intuitive, users have to think a bit more and plan a bit.

Between all these factors, a holistic decision must be made, taking into account the client, design team, specifics regarding project size, complexity and repetition.

If a client requires individual apartment numbers, then however much you might want to use links, you are going to struggle to work around this.

Of course there are work arounds, but is this optimal? That's where the expert takes their call.  Perhaps a persuasive senior team member can work their magic and help the client see the light, but we need to know now.

An honest assessment has to be made.... The classic example here is repetition. 

'We have 6 unit types'

.... ... Do you really? ...
Yes, they are mirrored of course, and the ceiling height is different on the top floor and bottom floor and on Block A we have a different drainage strategy, so the pipes are different sizes....   
... Oh Ok, so actually you have 50 unit types, well, that affects our assessment.


... Do you really? ...
Yes, we are desigining a point tower, everything stacks.
... Ok, let's do it then.

Other honesty is around the reality of the design process, once you're locked into links, if the structural engineer wants that different structural solution on another block, have your links just doubled in number?


The judgement has to take into account a deep understanding of what a link and group is, how its outputs are affected.

​For both options, having solid office workflows, with strong libraries of families and types, with graphic standards, is going to make all of this run smoothly whichever choice.

There is always going to be a downside, no option is perfect, so good communication, planning and strategy is always the highest priority.
0 Comments

9/21/2021 0 Comments

BIM Handover Explained: What’s Involved and What Comes Next


A well‑executed BIM handover ensures that the digital asset produced during design and construction becomes genuinely useful during operation. The goal is simple: deliver accurate, structured information that supports maintenance, performance, and long‑term asset management.

Planning for Handover

Effective handover planning starts with defining objectives, identifying stakeholders, and establishing a realistic timeline.

Clarifying Objectives

It really boils down to a few core questions:
  • Purpose — What data is required to operate the built asset effectively? What information supports maintenance, energy reduction commitments, or operational efficiency?
  • Who — Who will use the data? Consider internal teams, external stakeholders, and long‑term facilities management.
  • Detail — What level of granularity is actually useful? Too much data becomes noise.
  • Format — What formats do downstream systems require? If this isn’t known yet, a neutral schema such as COBie may be the safest option.

​These objectives should align with the broader goals of the project.


Identifying Stakeholders

Define who is involved in the handover process and what their responsibilities are. Project managers, contractors, architects, and facility managers all contribute different pieces of information.

Consider the experience level of your FM team and what support they may need. Early collaboration is essential to align expectations and avoid late‑stage surprises.


Establishing a Timeline

Handover deliverables are complex, iterative, and rarely “right first time.” Expect multiple review cycles. A clear roadmap helps set milestones for data collection, verification, and transfer.

The data itself is typically gathered from design models, reports, records, and manuals, then processed through BIM software (e.g., Revit) to ensure consistency and accuracy.

Quality checks should verify that:

  • Data aligns with project specifications
  • Clashes are identified and resolved
  • Models are coordinated and consistent
  • Operational and maintenance documentation is complete

​Executing Handover

If the groundwork has been done well, the execution phase becomes far more straightforward. The aim is to ensure that structured data flows cleanly into facilities management systems.

Typical steps include:
  • Exporting data from BIM software in a compatible format (e.g., COBie)
  • Importing data into the FM system
  • Verifying the accuracy of the transfer
  • Training key team members to use and maintain the information

Training at this stage helps teams understand the BIM processes, tools, and documentation involved, giving them confidence to manage the digital asset going forward.


What Happens Next?

Built assets evolve.

Keeping BIM models aligned with real‑world conditions is an ongoing task, and maintaining accurate digital records continues to pay dividends throughout the operational life of the building.

Regular updates ensure that the BIM remains a reliable reference point—ready whenever needed.
0 Comments

    Author

    Mark is a BIM Expert and qualified UK Architect.  He currently works with Reope building digital solutions for built environment.

    Archives

    July 2026
    January 2026
    October 2025
    September 2025
    March 2025
    December 2024
    February 2023
    May 2022
    September 2021

    Categories

    All

    RSS Feed

Powered by Create your own unique website with customizable templates.